Results That Hold Under Pressure

Across twenty-five years of operational leadership, site turnaround and performance recovery, I’ve delivered measurable results in some of the most demanding environments — from FMCG and fulfilment to pharma, NHS operations and PE-backed manufacturing.

My work focuses on stabilising systems, rebuilding rhythm, and delivering outcomes that sustain long after the intervention.

End State
£2.1M labour cost saving

21% efficiency uplift (9 months)

End State
£1.9M Saving

Site efficiency lifted from 35% to 60% (6 months)

End State
£4M Cost Removed

40% reduction in direct spend

End State
5x Output Increase

MES deployment and flow redesign

End State
Led operations for sites of up to 1,200 people

With operating budgets in excess of £100M+

End State
Delivered MHRA, GMP, BRC, AIB and food safety audit passes

Through structured preparation and leadership

End State
Operational lead

On multiple new line installations, commissioning and re-commissioning programmes (alongside engineering, and contractor teams)

End State
Stabilised and rebuilt failing MES/ERP implementations

Restoring flow, visibility and labour productivity

End State
Resolved industrial relations challenges

Including strike recovery, team rebuilds, and cultural resets during periods of high pressure

End State
Led organisations through major change

Redundancies, site closures, site expansions, rapid scale-ups, and post-merger resets

End State
Global programme leadership

Across multi-country operational projects

End State
Implemented and delivered

UK and Italian regulated licensing and certification projects with multi- vendor stakeholders

End State
Long-term operational stability

Running large, complex sites safely, consistently and without drama

Case Studies